University
Remove and store existing commemorative pavers onsite.
Supply & install shoring boards and shoring.
Excavate the soil to expose the existing burst pipes to allow for the repairs.
Provided with fencing, shoring, signage, sediment control and machines.
Remove excavated soil/stone from work areas daily and stockpile on site.
Backfill new trench with previously stockpiled soil, compact in grassy/landscape areas & the trench with RC-6 stone.
Reinstall commemorative pavers as they were before.