University
The wall in the center of all four bathrooms was removed, the floor below the old wall was leveled, and riser pipes were replaced by the mechanical contractor. Then Construction Heroes framed, hung, and painted the new walls, re-installed all the old fixtures, and provided new trim - all while protecting the original flooring.